Panattoni Logistics Centre, Mosonmagyaróvár
Location
Mosonmagyaróvár
Floor area
23.000 m²
Construction period
2025 –
Category
Logistics facilities
Type of power supply
Medium voltage
Capacity
1,6 MVA
Supply
1 x 1,600 kVA concrete-enclosed transformer substation
Systems installed
Fire detection system
Structured cabling system
Access control system
CCTV system
Intrusion alarm system
The power supply for the hall of the Panattoni Logistics Centre in Mosonmagyaróvár was implemented through 1 × 1,600 kVA concrete-enclosed transformer substation.
Low-current systems including fire detection, structured cabling, access control, CCTV and intrusion alarm systems were installed during the base building construction phase.