Panattoni Logistics Centre, Mosonmagyaróvár

Location

Mosonmagyaróvár

Floor area

23.000 m²

Construction period

2025 –

Category

Logistics facilities

Type of power supply

Medium voltage

Capacity

1,6 MVA

Supply

1 x 1,600 kVA concrete-enclosed transformer substation

Systems installed

Fire detection system
Structured cabling system
Access control system
CCTV system
Intrusion alarm system

The power supply for the hall of the Panattoni Logistics Centre in Mosonmagyaróvár was implemented through 1 × 1,600 kVA concrete-enclosed transformer substation.

Low-current systems including fire detection, structured cabling, access control, CCTV and intrusion alarm systems were installed during the base building construction phase.