01 Dec 2025 HAVI Logistics Hall – Alsónémedi Power supply of the HAVI refrigerated logistics hall in Alsónémed with a 1×2000 kVA concrete transformer station and complete low-voltage systems. Read more
01 Dec 2025 UNILEVER Manufacturing Plant – Nyírbátor Power supply of UNILEVER's Nyírbátor production hall with a 1×1600 kVA concrete transformer station, fire alarm and structured network system. Read more
01 Dec 2025 HelloParks warehouse halls – Maglód HelloParks logistics hall power supply with 1×1600 kVA concrete transformer station, fire alarm and structured network system. Read more
01 Feb 2025 Panattoni Logistics Centre, Mosonmagyaróvár Power supply of the warehouse hall of the Panattoni logistics center in Mosonmagyaróvár with a 1×1600 kVA transformer station, with the installation of complete low-current systems. Read more